Oregon Convention Center Cooling Water Process Loop Replacement



Summary

The Oregon Convention Center Cooling Water Process Loop project took place during the winter of 2019. Hydro-Temp’s scope was to remove and replace a cooling tower and pumps, as well as completely re-pipe the existing system. This system served the kitchen areas of the Convention Center, which are critical to any event they are holding. With this being the case, Hydro-Temp was only allowed one month of shutdown time to ensure no events had to be cancelled. During this month, nearly 4000 feet of pipe was installed, four pumps were swapped out, and one cooling tower was replaced. Working as a mechanical prime allowed Hydro-Temp and the owner to work side-by-side and produce great solutions to keep their operations running throughout construction.



Other Projects


PIA Concourse D

Portland International Airport

Continue Reading Portland International Airport

OSC Cams

Oregon State Capitol – CAMS Renovation

Continue Reading Oregon State Capitol – CAMS Renovation

Oregon State Police Crime Lab Cooling Plant Replacement

OSP Crime Lab Cooling Plant

Continue Reading OSP Crime Lab Cooling Plant

  • Home
  • News Page
  • Projects Page
  • Careers
  • The Team

Copyright © 2025 · Hydro-Temp Mechanical · All Rights Reserved · Designed by TSC