Recent Projects


Sam Barlow HS

HydroTemp is proud to have been a RFP selected Core Team member to develop & detail the mechanical scope on a very tough remodel with a significant STEM addition.

Sam Barlow High School Addition & Renovation
OCC Cooling Loop

The Oregon Convention Center Process Loop project took place during the winter of 2019. Hydro-Temp’s scope was to remove and replace a cooling tower and pumps, as well as completely re-pipe…

OCC Cooling Loop Replacement

The North Gresham Elementary School project consisted of the replacement of an existing 57-year-old school. The new building is 72,000 sf, two stories, and has 24 classrooms. The school will increase…

North Gresham ES Replacement
GFU Res Hall

George Fox University’s Newlin Hall was completed in the summer of 2019 and is now the largest living facility on campus, sitting at 48,300 square feet. The newly built four-story residence hall boasts 97 rooms…

George Fox University New Residence Hall
PPS Fixtures

Replace 132 individual drinking fixtures across 28 different schools in the Portland. The fixtures replaced had high lead content that did not meet Portland Public School (PPS) standards…

Portland Public Schools Fixtures Replacement
OSP Crime Lab

The Oregon State Police Portland Crime Lab project was completed in the summer of 2019. Hydro-Temp Mechanical replaced four rooftop makeup air units and the facility’s existing chilled water plant with new equipment…

OSP Crime Lab Cooling Plant Replacement
Portland Public Schools

Beaverton Sister Schools – William Walker, Vose, Hazeldale and Sato Elementary

Beaverton Sister Schools
Reynolds High School

Serving over 2,800 students each year Reynolds High School is a staple to the community who call Reynolds School District home. Alongside Pence Construction, Hydro-Temp Mechanical had the privilege of helping…

Reynolds High School
PSU Karl Miller Center

The PSU School of Business Administration’s renovated 143,000 sqft facility opened Fall 2017 and has since achieved LEED Platinum. HydroTemp worked closely with all team members through preconstruction to BIM to construction to renovate the occupied building in 3 challenging phases.

PSU Karl Miller Center
Oregon State Capitol CAMS Renovation

The Capitol Accessibility, Maintenance and Safety project was approved by the 2016 Legislative Assembly to address Americans with Disabilities Act deficiencies; at-risk mechanical, electrical and plumbing systems; and security and life-safety issues in the Oregon State Capitol building.

Oregon State Capitol CAMS Renovation
OSU Johnson Hall

This building is home of OSU’s School of Chemical, Biological, and Environmental Engineering. It houses a 125-seat lecture hall, state-of the-art research and teaching laboratories, and a center focused on improving recruitment and retention of engineering students.

OSU Johnson Hall Construction
PIA Concourse D HVAC Replacement

To increase passenger comfort, replacement of the Concourse D Heating and Air Conditioning system serving 100,000 sqft including gates D10- 15, the Federal Inspection Station and security checkpoint was essential.

PIA Concourse D HVAC Replacement


Past Projects


Oregon Hall

Complete retro fit of 3 floors of office space. A new heating water hydronic pumping system in basement and complete new mechanical room for chilled beams on the second floor…

U of O Oregon Hall Retrofit
Middleton ES

Renovation of hydronic piping system from a 2-pipe system to a 4-pipe system. Combined heating/cooling lines were separated into individual heating and cooling lines. Replaced (31) unit ventilators…

Middleton Elementary School Renovation
Justice Center

The primary focus of this project was to re-pipe the (30) core restrooms from floors 11-15 of the Justice Center Building. Existing piping was upgraded to…

Justice Center Bathroom Re-Pipe and Upgrade
Walnut Park Dental

Replacement of (5) RTUs and addition of (8) RTUs. Upgraded structural at RTUs and patched roofing. Reroute and new install of ductwork for RTUs …

Walnut Park Dental HVAC Upgrades
Casanova Center

The CasX is as architecturally sensitive of a project as there can be. The client has the highest of standards for the Ducks football programs…

U of O Casanova Center Extension
East Campus Res Hall

University of Oregon’s new 185,000 square foot residence hall achieved LEED Gold certification. This residence hall will be a…

U of O East Campus Residence Hall
College of Education

The University of Oregon College of Education task consisted of three projects; a new 66,000 square foot three story building on top of a 47,000 square…

U of O College of Education
PacTrust Vancouver

This CTC651 project is a design build project. It is intended to be the Nautilus headquarter, yet at the same time be universal for all possible future tenants. The current…

PacTrust Vancouver – Nautilus
Eugene Water & Electric

This facility achieved a LEED Gold certification for EWEB. The new operations center is a 52 acre site that consists of three main buildings…

Eugene Water & Electric Board
OSH Junction City

The 223,000 sqft 174 bed psychiatric facility achieved LEED Silver. We are using an open loop geothermal ground source heat pump system to heat and cool utilizing a heat recovery chiller, chilled beams, hospital style AT/EV’s, fan coils, natural ventilation, heat recovery air handlers and a large solar array for domestic water heating.

OSH Junction City